HOME

Summary

Currently rolling stock electromagnetic emissions is a major concern for train manufacturers and railway infrastructure operators [ERA EMC Report 2010]. Available harmonized EMC standards (EN50121-2, EN50121-3-1 and EN50121-3-2) do not completely address interoperability issues caused by rolling stock interferences with signalling systems (GSM-R, BTM, LTM and STM). Moreover, these standards do not cover representative worst-case conditions derived by transients in the rolling stock behaviour typically generated by feeding and track circuits’ discontinuities.

Looking for stylish and safe protection for your phone? Look no further than our online store, where we specialize in phone accessories with “telefoonshoesje” as our theme. Our selection of “smartphonehoesjes” will keep your phone protected from bumps and scratches while also adding a touch of personal style. With 20 years of marketing experience, we know how to create advertising copy that speaks directly to our customers’ needs. So why wait? Browse our collection today and find the perfect “telefoonshoesje” for your phone!

replica watches

Discover the enchanting world of Sapori Progettati Per Affascinare with the elf bar fanta strawberry. Our store, with its long history of selling vape quality products, is proud to introduce this delightful flavor. The Elf Bar Fanta Strawberry captivates with its luscious taste, offering a truly mesmerizing vaping experience.

On one hand this situation causes an important waste of time and resources for train manufacturers when integrating rolling stocks and signalling systems. And moreover in already tested trains, occasionally problems may still arise. Then, not only the responsibilities but also the technical solutions are not straight forward. The duration of the field testing employed to solve this kind of problems and to go through the certification process may vary between 3 months and 12 months. And the cost of the complete process may vary between 25k€ to 1,5M€ [ERA EMC Report 2010].

On the other hand, railway infrastructure operators suffer the railway infrastructure availability reduction caused by the rolling stock electromagnetic incompatibility with the safety critical signalling systems. The previously commented problems might cause an estimated reduction of 10% of the availability in the most crowded lines.

In this context, TREND (Test of Rolling Stock Electromagnetic Compatibility for cross-Domain Interoperability) project has the objective of addressing this situation by means of the design of a test setup that enables the harmonization of freight and passengers rolling stock approval tests for electromagnetic compatibility (EMC) focusing not only on interferences with broadcasting services but also on railway signalling systems. TREND will also identify and design the cross acceptance test sites on electrified and non-electrified lines that reproduce representative worst case conditions for steady state and transient behaviours. These worst case conditions will be obtained thanks to the modelization of the rolling stock and the rail and feeding infrastructure.

The thorough analysis comprises measurement, modelization and safety and availability analysis of the effect of rolling stock’s EMIs on the neighbouring systems. The system potentially affected by these EMIs will be completely covered. These are classified in four research areas: spot signalling system (which includes BTM, LTM and STM), track circuit, GSM-R and broadcasting services (which include TV, radio, Freight RFID, WFI and GSM). This complete physical environment will permit a precise analysis of the EMI coupling model affecting the whole communication systems. Thanks to the safety and availability model of the communication systems, TREND will design a test procedure that recreates representative worst-case for the rolling stock electromagnetic emissions that could affect interoperability including transient phenomena.

Project acronym:
TREND

Project name:
Test of Rolling Stock Electromagnetic Compatibility for cross-Domain interoperability

Project reference:
FP7- TRANSPORT-285259

Start date: 01/11/2011
End date: 30/04/2014

Sponsored by

Links

European Commission Sites

Cordis
http://cordis.europa.eu
Framework Programme 7 energy
http://cordis.europa.eu/fp7/energy

Gallery